top of page

Departing to Go To Sea CHECKLIST


  • Plot route, check weather, VHF on, deploy charts

  • Deploy headsets and life vests

  • Close & double-dog all portholes

  • Secure all doors, hatches, drawers inside (especially refrigerator/galley)

  • Confirm decks clear/clean/secure

  • Stow antennas/mast if required

  • Confirm dinghy/bikes/grill/aft deck box/Davits all secure

  • Place taffrail table in down/locked position

  • Turn off shore power at  panel

  • Communicate departure plan with crew

  • At podium: Kill breaker and disconnect shore power

  • Stow power cables

  • Engine room: 

    • Turn on inverter

    • Confirm engine cooling valve is open

  • At boat panel: Turn on switches for inverter and parallel bus A & B

    • Turn on “underway” nav/operation switches, air compressor

    • Turn off: hot water heater, battery charger

  • Start engine

  • Confirm cooling water being pumped out transom

  • Confirm alternator is charging battery banks

  • Confirm necessary AC/DC equipment powered and operating

  • Turn on remaining navigation and control equipment 

  • Note departure time/mileage/EH in logbook

  • Check bow thruster

  • Confirm departure plan with crew

  • Check that ALL lines are untied from dock, check for extras

  • Stow ALL fenders and lines before clearing harbor, 

  • Engine room check while at sea - leaks, temp, loose items, unusual noise

    • Alternator displaying 13.8V (?)



Recent Posts

See All

© 2023 by Sprague

bottom of page